Default Update

I've talked about pouring a floor cap, but the added floor height just won't work.

Anyway, I talked to my contractor and he has basically said he would make it right. He's a good guy that I've known for a long time. I approached the situation from the perspective that I had as much responsibility in it as he and the concrete guys do. I told him that I must not have communicated as clearly as I thought I did and he agreed that he may have misunderstood.

We left the situation with him promising to make it right. His plan is to continue with the framing of the building (weather permitting!) an then we can talk about whether or not I still feel the floor needs to be re-done. If it does, he said he'll take care of it. I told him that we could sit down and talk about the actual cost of it and make a fair and reasonable deal to fix it. I know this could very easily overcome any money he would make on the project and I want to be fair to him.


Thanks for the input.
__________________
__________________
Brandon Wiedeman
'72 Suburban
'67 Chevy II -
https://lateral-g.net/forums/showthread.php4?t=46846

I have about 3 lifetimes worth of projects planned out in my head!

Last edited by wiedemab; 12-26-2012 at 09:10 AM.
Reply With Quote