View Single Post
  #33  
Old 12-29-2012, 10:38 AM
Sieg's Avatar
Sieg Sieg is offline
Moderator
 
Join Date: Dec 2010
Location: Pacific Northwet
Posts: 8,034
Thanks: 33
Thanked 102 Times in 41 Posts
Default

Quote:
Originally Posted by Perry Mitchell View Post
I say, get over it. You will never notice it. You won't hang your shelves at that slope. The contractor performed his work per industry standards. 1/8'' per foot equals 1% which is minimal. Most contractors can't get it that flat when it is supposed to be level. My garage floor is sloped at 1% and it is not noticeable. I have a 4 post lift and two roll away tool boxes and nothing has rolled out the door yet. When you walk down the sidewalks in your town, you don't tip over do you? They are most likely sloped at 2% or 1/4'' per foot. Really, it won't be an issue for you. Sorry you guys didn't communicate better.
Agree.........and some day that slope may work in your favor. If they poured it "flat" it wouldn't be and your lifts and tables would still require some degree of shimming to achieve a true level.
Reply With Quote