View Single Post
  #9  
Old 03-04-2013, 10:31 AM
Torq'd Design Lab's Avatar
Torq'd Design Lab Torq'd Design Lab is offline
Member
 
Join Date: Nov 2012
Posts: 66
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Thank you all! The total build took a little over 9,100 hours from start to finish. We do not have a car that is competing this year, but one in the shop is in the works to compete in future years. We will be there showing the car once again this year along with almost 30 other Ridler winners throughout the years. Should be a great show!



The floor is a double-walled floor that hides a 1"x2" floor frame and a hidden internal rollcage in order to make the convertible more stiff. It also flows and lays directly on top of the crossmembers.







__________________
Torq'd Design

Tyler, TX
(903)245-5675
[email protected]

www.torqd-design.com
www.facebook.com/torqd
Reply With Quote