Floors
Well, I've made some progress with the floor with a lot of help. A bit of a learning curve with doing bead rolling and oil canning but, nothing that we won't figure out. So far, the floor boards are done with the first part of the transmission tunnel. Not a lot of sexy stuff here so far...I figure I'm about six months or so away from that.
Last edited by renegade6; 09-15-2013 at 07:43 PM.
|