View Single Post
  #4  
Old 11-29-2013, 01:00 PM
kwhizz's Avatar
kwhizz kwhizz is offline
Lateral-g Supporting Member
 
Join Date: Nov 2005
Location: Kenosha , wi
Posts: 1,138
Thanks: 752
Thanked 440 Times in 165 Posts
Default

I finally got the Gas tank installed.........would have been a lot simpler if they would have supplied bolts for the straps that were 1/2" longer........Just couldn't get the nuts started........went and got some longer ones today and 5 minutes later it was in.....I also have the fuel line installed and completed........I also got the drive by wire gas pedal installed.......As long as I have the room while waiting for the new radiator to show up I'm going to get the intercooler pump and lines all run..........need to find a reservoir for the system........












Reply With Quote