View Single Post
  #41  
Old 12-06-2013, 11:34 PM
LS7 Z/28 LS7 Z/28 is offline
Senior Member
 
Join Date: Oct 2013
Posts: 453
Thanks: 0
Thanked 10 Times in 5 Posts
Default

We recently added a frame extenstion to the back half of the chassis and cut out the trunk floor along with the old frame rails. We made a fuel cell frame/guard that will be removable with four bolts. Later we will make the upper straps for the cell when the new floor is in place. One of the next things we are planning is doing metal work in the trunk area. We will also be starting on the full rollcage soon, along with seat and pedal mock up.

Here are some before and after photos of the fuel cell guard and new chassis back half.
Attached Images
      

Last edited by LS7 Z/28; 12-07-2013 at 01:05 PM.
Reply With Quote