View Single Post
  #100  
Old 01-19-2014, 08:00 PM
gerno's Avatar
gerno gerno is offline
Senior Member
 
Join Date: May 2005
Location: Austin, TX
Posts: 526
Thanks: 0
Thanked 5 Times in 5 Posts
Default

Driver side tub installed and I think I'm done with the major fab work. I have to say the second tub was much easier than the first. Beside the overall fear of cutting the car up the mini tub install was very straight forward and not too difficult. All that's left now is
-Seal tub seams and paint trunk
-Reinstall the rear suspension
-Lube the axle bearings and install the seals
-Connect the master cylinder
-Tighten all suspension bolts
-Bend up the brake lines
-Install the parking break cables
-Reinstall roll bar and all interior
-Pull SBC
-Install hydraulic clutch
-Install LS3
-Wire LS3
-Build exhaust
No big deal...that should be a week, right?

Name:  IMG_2339.jpg
Views: 425
Size:  36.6 KB

Name:  IMG_2340.jpg
Views: 424
Size:  35.3 KB

Name:  IMG_2341.jpg
Views: 418
Size:  54.8 KB

Name:  IMG_2342.jpg
Views: 429
Size:  52.9 KB

Name:  IMG_2343.jpg
Views: 431
Size:  54.2 KB

Name:  IMG_2344.jpg
Views: 435
Size:  50.6 KB
Reply With Quote