View Single Post
  #791  
Old 01-21-2014, 04:26 PM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,156
Thanks: 4
Thanked 35 Times in 21 Posts
Default

Well 2014 has already been a very busy one here at the shop. We have grown to 8 guys in the shop, plus my wife and I. We have lots of work going on. Some major projects and some other parts and pieces kinda jobs.

I'm pretty excited about a 55 Chevrolet project we are now doing with Fairway Chevrolet again. It will be a wedge section 55 Chevrolet post on one of our frames with some good past goodies bolted to the new LSX376-B15 crat engine. We hope it will make in the neighborhood of 8-900hp with an F-1 Procharger.

Here is picture of what we started with.


After a lot of cutting here is where we are now.




You can see how much the unmodified fender hangs below the rocker.


In these picture you can see the gap in the sheetmetal above the intake.

After
__________________
www.ironworksspeedandkustom.com
Reply With Quote