Quote:
Originally Posted by mikeextrafast
we are getting ready to remove the front sub frame as well.... whats the proper way to reinstall it so its in the wright position?
|
On a lift hoist we usually use a plumb bob to get it close. Lower the body about a 1/2" of clearance then put the bushings and bolts in loose, then shift the body around with the rods to line the frame to body.