Forgot to put the posts back that were lost in the server debacle, this and the next are from about 2wks ago...........
So the last substantive fabrication/welding task was to finish the install of the Lateral Dynamics 3-Link. I had the front x-member in before work stalled.
The remaining bits were installing the rear x-member, closing out the torque box, and installing the close-out panels/boxes to make room for the upper trailing arm.
Here's the rear x-member installed. I had it powder coated in a light gray. I hated to cover up Matt's welds, but the guy at the PC shop said a clear PC would discolor and look really lousy.
For some reason, I really enjoy doing those rosette welds. They're just kinda fun. As you can see, I had to put a doubler on the frame to take up the gap between the length of the x-member and the width of the frame. James had to pound his frame rails out to make his fit. Yeah late-60's manufacturing inconsistencies!
Here's the torque box closeouts. I hadn't finished grinding the welds down when I snapped the pic. Kathy was calling me to dinner.
Then I roughed in the trunk pan closeout and the doghouse that houses the upper link on the rear end housing.