Thread: Project 1969
View Single Post
  #9  
Old 09-28-2014, 07:52 PM
Intimidator3's Avatar
Intimidator3 Intimidator3 is offline
Member
 
Join Date: Apr 2014
Posts: 88
Thanks: 0
Thanked 3 Times in 3 Posts
Default

Meanwhile, back at the fab shop, my car is getting a lot lighter...

Cut out the cowl, right side cowl shoulder, floor pan, trunk pan, and left rear quarter panel...








At this point, with all that out of the way, I decided to go mini tub and 4-Link rear suspension. So Corbin added that to the parts list for me.

New parts came in and the car starts to go back together.







Start of some of the pre-fab work for the minitubs.


Tail pan


Trunk pan fitted



Ready for the tubs





Fixed that rust spot with a new section



To be continued... Thanks for reading!

Last edited by Intimidator3; 07-16-2017 at 08:54 AM.
Reply With Quote