Tomorrow we bolt in the LS2 and T56 and start the process of getting her running. Should take 4-5 days for all the systems then back to BOS to get the front sheetmetal re-hung.
Yesterday we finished up the LD 3-link and the brakes.. the results:
__________________
"A ship in port is safe, but that's not what ships are built for."
See Bad Penny run the cones:
https://www.youtube.com/watch?v=8GUPPIX-92U
1971 Chevelle Wagon - Roadster Shop Chassis ProCharged Shafiroff LS and lots of yada yada
1968 Camaro - Project Track Rat - 440 RHS LS