View Single Post
  #195  
Old 08-23-2006, 09:10 PM
BThibodeaux BThibodeaux is offline
Lateral-g Supporting Member
 
Join Date: Aug 2006
Location: Houston, TX
Posts: 310
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by Steve1968LS2
Tomorrow we bolt in the LS2 and T56 and start the process of getting her running. Should take 4-5 days for all the systems then back to BOS to get the front sheetmetal re-hung.

Yesterday we finished up the LD 3-link and the brakes.. the results:

Steve,
I am a three link dummy, so please forgive me. Why so much coil adjustment on the left vs. right. A function of the left Watts link being on top?

Beautiful setup! Way above scrub line for all the worriers out there.

Thanks,
BT
Reply With Quote