Thread
:
'66 nova project
View Single Post
#
151
10-21-2014, 05:01 PM
kevin_l
Senior Member
Join Date: Mar 2014
Posts: 365
Thanks: 4
Thanked 17 Times in 13 Posts
~originalSubframe connectors are fully welded, also sandblaster the top of the floors yesterday and today. After a few more hours with the blow gun removing abrasive out of all those nooks and crannies I'll be laying down some more PPG dp90. I wished the trunk pan would have cleaned up better. If I could go back in time, I would have replaced it before the quadralink install. The floor pans cleaned up great, some pitting in the passenger side toe board but nothing bad.
Last edited by kevin_l; 08-07-2017 at
08:26 AM
.
kevin_l
View Public Profile
Find all posts by kevin_l