Still a long way. I'm only getting one day a week to work on it. I still have to run fuel line (stainless hard line), make a crank pulley, fix a coolant leak around my belt drive, rework my intercooler charge tubes, wire most everything, shorten my driveshaft, fill and bleed all fluids, alignment, hang the exhaust and build a new air intake and filter box. Hopefully it will be done before spring is here, but I'm not rushing it.
Last edited by MeanMike; 12-28-2014 at 04:52 PM.
|