welding generates heat! So I worked on getting the subframe connectors lined up and snug .... (a little anal retentive) I had to open one side to get the subframe to line up with the rear frame rail and left a gap on one side, grrrrr.
Well I got the connectors in and welded to the floor, still need to attach the seat metal to the floor, waiting on warmer day to spray some epoxy under the seat frames.
That's all I have for today, that actually took longer than I thought it would ...

, but it's done!
Thanks for looking ...