The upper portion of the repair section was punched with a dimple die on a Mittler Brothers brothers punch in order to replace the original flared holes. These holes provided strength for the panel.
Then, the curved lower section was TIG welded to the upper. Soon, the rusty portions of the structure had been completely replaced.