View Single Post
  #33  
Old 03-07-2015, 08:11 AM
UMI Performance UMI Performance is offline
Senior Member
 
Join Date: Dec 2014
Location: Philipsburg, Pa
Posts: 209
Thanks: 0
Thanked 3 Times in 2 Posts
Default

More progress on the LeMans.

Jerry is tying up all the wiring and making sure everything works. We don't have front fenders painted yet so it is tough to permanently mount everything. Jerry also installed the radiator, electric fans, power steering cooler and Magnuson intercooler. He is getting everything to fit correctly in the radiator support before we finish it and send it into powder coat.

Jerry uses our CNC laser to cut mounting templates for both the radiator mounts and a new tunnel. He uses cardboard as a template to prevent wasting steel.







Today Brian, one of our fabricators here at UMI is building the tunnel for the T56. We purchased a tunnel replacement from American Powertrain but is was too small, we should have known. So Brian will use the purchased tunnel as a base and then build off of it. We used our laser to cut plates to finish it.





Reply With Quote