View Single Post
  #3  
Old 03-19-2015, 02:59 PM
Doug1's Avatar
Doug1 Doug1 is offline
Senior Member
 
Join Date: Sep 2009
Posts: 266
Thanks: 1
Thanked 10 Times in 3 Posts
Default

So on to the man cave / shed. I didn't have a lot of land to work with so I had to go with the non-permit required less than 500 sq. ft. shed. I ordered up a 20x24 box built on skids. I made a few changes to their normal build. First I required the skids to be set on block set in 2 ft. increments instead of 3 ft. or 4 ft. as they normally built and I required them to set the 2x12 joists 1 foot on center to give the floor lots of support. I called up Direct Lift and got the exact measurements for their 4 post lift and then proceeded to put 4 joists together in the two sections where the lift feet would land. Then I went with 2 layers of 3/4" subflooring.

So here is a picture of that when it was first set up...





Now I know you are thinking… “WTF was he thinking?”  Hang in there and you’ll see…

Last edited by Doug1; 03-19-2015 at 03:18 PM.
Reply With Quote