The fuel system is now completely installed, including the Finch Performance Dual Overflow Canister is installed, bleed line for the clutch installed, exhaust system finished, and carpet / sound deadening is done. Friday I will be dropping off the RnD Fabrication radiator with HD fan & shroud kit (dual spal 12" HD fans), as well as the PS Reservoir with AN fittings. All that is really left is fluids, radiator hoses, and a cold air intake and filter, then we'll be ready to fire it for the first time. It'll be a while before I can swing the door panels and seat upholstery, as well as the Redline Lumtronix (or similar) headlights, but for now at least the car is just about done.
Here are a few more progress pics: