Seats have arrived!
Been gathering the remaining parts needed and have quite the list of things to finish. All that's left to order are the gauges and fuel pump and filters.
So now that most of the parts are in house and the holidays approaching, I'm going to use some of my free time to try to make a dent in the list...
1. Mount battery in trunk
2. Install Ron Francis fuse block and wire car
3. Install Corbeau seats and tracks
4. Remove front part of roll cage if it is too close to driver or passenger.
5. Install Vintage Air kit
6. Install dash
7. Install clutch master cylinder and plumbing
8. Plumb brake lines.
9. Plumb fuel lines.
10. Install Hydratech hydra-boost system
11. Order and install fuel pump and filters
12 Install glass
13 Modify rear side panels to fit DSE tubs
14. Finish rear seat delete interior treatment
15. Order and install gauges
16. re-install doghouse
17. Install radiator and fans
18. Install Oil recovery vacuum canister
19. Install over flow tank for radiator
20. Install Luhn Performance built pulley system and power steering pump
|