View Single Post
  #141  
Old 01-29-2017, 01:42 PM
Boss 5.0's Avatar
Boss 5.0 Boss 5.0 is offline
Senior Member
 
Join Date: Sep 2010
Location: Connecticut
Posts: 406
Thanks: 16
Thanked 19 Times in 10 Posts
Default

I got the roof and both quarters all sanded and buffed. Now time to move on to some mechanical things. I bent up the stainless brake lines, got the heater box and inside heater hoses hooked up. Then I dropped the engine in place, what a moment! A little too much chrome for me, but the valve covers and air cleaner are not staying. I have a set of paint matched Billet Specialties covers to install later after all the fab/dirty work is done. Don't want to scratch them.

Then I got the car back off the floor and up on the Quick Lift ramps. Now I can install the transmission, run the fuel lines, get the driveshaft in etc. So much to do..........












__________________
Copper Hill Rod & Custom

1955 Chevy BelAir
1951 Chevy 3100
1987 Chevy R10

Glenn
Reply With Quote