Thread: 69 Nova
View Single Post
  #92  
Old 03-30-2017, 08:16 AM
jeds jeds is offline
Senior Member
 
Join Date: Jan 2014
Posts: 149
Thanks: 1
Thanked 0 Times in 0 Posts
Default

Well, not a ton of progress. The dash is out and the motor mounts have been tacked in but still need a bit of tweaking.

The motor mounts will be easily removable from the frame to aid in engine removal. We will be running crush tubes through the subframe rail and running bolts through the rail from the outside.








This picture gives a decent idea of where the motor sits in relation to the hub centerlines.




The last thing we did was do a trial fit of seat placement (not my seat). Needless to say, there won't be a back seat





Next up is building the exhaust and ordering a driveline so we can get the transmission crossmember built.
Reply With Quote