View Single Post
  #36  
Old 12-05-2017, 03:07 PM
TCI Engineering's Avatar
TCI Engineering TCI Engineering is offline
Member
 
Join Date: Feb 2017
Posts: 73
Thanks: 1
Thanked 12 Times in 8 Posts
Default

Still plugging away on the center section. Built the main tranny hoop and tied it in with some downbars. It is just tacked in place at this time. I still need to throw the cab back on to confirm placement. It'll make sense why the tubes are on top of the frame once the cab is back on.



I still need to make a couple tabs to close out the round tube on top of the frame.



The rear tube placement must be 21" behind the front one to fit properly. I plan to tie the driveshaft loop, tranny mount and Torque Arm mount all together in that area.

__________________
www.totalcostinvolved.com "Quality doesn't cost, it pays"
Reply With Quote