View Single Post
  #80  
Old 10-03-2018, 07:54 AM
nicks67ca nicks67ca is offline
Senior Member
 
Join Date: Oct 2007
Posts: 309
Thanks: 12
Thanked 13 Times in 7 Posts
Default

been moving forward....I have been wiring the car. I wanted everything loomed and clean and accessible.

Engine in.



I used a C&R universal radiator with oil cooler. I made my own mounting bracket and running a spal fan with DCC PWM fan control.



need to move around some wires but here are some of the looms everything is wrapped, taped, i used a combination of zip ties and plastic ring clamps that attached into bolt holes



I have the VA condenser in. I will need to modify the hood latch and support to clear the supercharger hx. The ac dryer will need to be moved as well. I will also tape the core off and paint the sides and tab black. then lightly paint the core to help black it out.



Whats next:
Rock Valley / Vaporworx fuel setup
Ubuild it Air Raid intake
Test fire.
Reply With Quote
The Following User Says Thank You to nicks67ca For This Useful Post:
syborg tt (12-01-2018)