View Single Post
  #48  
Old 06-04-2019, 10:21 AM
1965_SS's Avatar
1965_SS 1965_SS is offline
Senior Member
 
Join Date: Oct 2010
Location: Central Valley, CA
Posts: 258
Thanks: 30
Thanked 15 Times in 13 Posts
Default

I got the trans tunnel all cut out and the interior floor all in epoxy primer. Decided to put the body on the frame to check things out. I need to get the trans tunnel fabbed and get the firewall smoothed out. After all that I can paint the underside and firewall.
Attached Images
 
__________________
_________
Todd
1965 Chevelle SS
Project Build
Reply With Quote
The Following User Says Thank You to 1965_SS For This Useful Post:
camcojb (06-04-2019)