View Single Post
  #25  
Old 09-25-2019, 05:57 PM
KHShapiro KHShapiro is offline
Member
 
Join Date: Aug 2006
Posts: 50
Thanks: 1
Thanked 9 Times in 3 Posts
Default

body channeled over the subframe and frame connectors. tunnel had to be moved as well .
ride height will be controlled by JRI hydraulics
Attached Images
    
Reply With Quote
The Following User Says Thank You to KHShapiro For This Useful Post:
Goosesdad (12-14-2025)