When grounding the sending unit for the ZL1 pump, should I route a ground from the pump connector to the chassis
AND split that ground to run along a twisted pair to the Dakota Digital HDX box? I’m basing my question off the second bolded section in page 11 of the gauge instruction:
https://www.dakotadigital.com/pdf/HDX_manual_main.pdf