[QUOTE=comp-spec]on an 80% qtr, i will usually butt weld the 2 panels together about 1/4" down from the bodyline, then i tig weld the whole seam with .035 er70s rod....about 1/2" at a time.....finishing grinding it with 36gt on a 3" angle grinder. it takes forever and sux to do, but it is about the only way of doin it where the seam is 100% invisble even with temp change induced expansion/contraction.
[QUOTE]
Thats the way u do it
But why would u do that when a full qtr is available Its a much better job and less work then the 80% qrt. The difference in bodywork out ways the cost difference of a full qrt
|