View Single Post
  #23  
Old 03-26-2007, 08:39 PM
10Seconds's Avatar
10Seconds 10Seconds is offline
Member
 
Join Date: Oct 2005
Posts: 96
Thanks: 0
Thanked 0 Times in 0 Posts
Default

To start the Mini-tub process, we had to do lots of cutting. Basically, we cut out the factory wheelwells, and since I built the new rear frame section, we cut out the entire factory rear frame rails. Then we cut out the rest of the sheetmetal to meet the new framerails, which will be installed as a continuation of the front rails, running parallel the whole way back.



Reply With Quote