View Single Post
  #1  
Old 05-16-2007, 08:44 PM
ItDoRun's Avatar
ItDoRun ItDoRun is offline
Senior Member
 
Join Date: Jun 2006
Location: Zachary, Louisiana
Posts: 921
Thanks: 0
Thanked 1 Time in 1 Post
Default Floor Pan Replacement

I just received my full length floor pans from NPD today and am a little concerned as to how these things will weld in. Let me see if I can explain this. The original pan folds over and spot welds to the rocker panel from under the car. The new pan 90's up and stops. It appears that you spot weld the new ones to the rocker from inside the car. Anyone ever experienced this? Are all replacement pans made this way?
__________________
Chris
1968 Camaro: DSE tubs and sub frame connectors, Chassisworks G-Link rear suspension, Speedtech upper and lower control arms, Chicane front coilover conversion with QA1's, Baer brakes, 18" Forgeline SO3's, Vintage Air, 6.0L LS 417 rwhp, 4L65E, Moser 12 Bolt w/3.73's....
http://www.cardomain.com/ride/2391864

Build Thread: https://lateral-g.net/forums/showthread.php4?t=19253
Reply With Quote