Thread: Project FNQUIK
View Single Post
  #1006  
Old 06-05-2016, 09:57 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,424
Thanks: 908
Thanked 336 Times in 229 Posts
Default

Now on to the Frame notch.
We geusstamted on where we would need to cut the notch with some tape. then we removed the engine.


I then put the A/C bracket and compressor ( which got ordered the day we took the engine out.) on the motor to try and see how we did with the tape.
Next was to brake out the air tools! We made some cuts.
Big cuts!!
First cut.



Need more
Second cut



Needed more
Final cuts





The small opening over the lower control arm will be filled in with 1/8"-3/16" plate, then the finish pocket for the A/C will be made in the same material.
That's where we stand right now .
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK

Last edited by waynieZ; 06-05-2016 at 10:15 PM.
Reply With Quote