Thread: Project FNQUIK
View Single Post
  #1267  
Old 10-22-2021, 11:08 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,424
Thanks: 908
Thanked 336 Times in 229 Posts
Default

I got the car back from the welder, partially done. He did the sub frame connectors and the exhaust ,but said he couldn't do the main thing I wanted done the, coil over conversion. It ended up being a lesson learned that I don't seem to be getting through this Portuguese Cabeca.
Now it's time to find someone else to do it.

I got some work on the plumbing for the heatexchanger The lower tubing at the bottom was easy 3 90's welded up from pump to exchanger. The top was a little harder finding room for the tubing, the A/C line and the RS door. A little trim on the door, re arranging the A/C line and a hole through the rad support with an AN fitting for the hose. Making the hose fit on the supercharger around the fuel rail crossover.

Here's the bottom tubing



The top for the return




Next post will be the exhaust pics.
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote
The Following 6 Users Say Thank You to waynieZ For This Useful Post:
camcojb (10-23-2021), EVIL SS (10-24-2021), jarhead (10-23-2021), kwhizz (10-23-2021), mfain (11-19-2021), warhawkchevelle (10-23-2021)