...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 05-29-2007, 09:26 AM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,156
Thanks: 4
Thanked 35 Times in 21 Posts
Default

Quote:
Originally Posted by killer69
WE built the chassis for the nova and the track is 52.5 but it runs 19 x 8.5 with 6 bs and it goes lock to lock with room to clear and the frame is 4" off the ground.
Wow those control arms must be burried against the Engine. I thought you guys used an art morrison clip on the front. SORRY. What rack did you guys use, we use a woodward rack on all our projects like this.

So when I tell john his car is like 10lbs of crap in 5lbs bag you completely understand where I'm coming from.....
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:30 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net