Finished the DSE dash insert.
We measured placement for the gauges, vent, switches and head unit. The tolerances for the gauge holes were very tight so Dick had to cut the crude holes. I smoothed them with a "dental tool". Everything fits nice and snug. We wrapped the gauges with a strip of masking tape to mimic the effect of paint.
Jesus shot the primer, Trevor and I did the wet sanding and then Jesus painted it.
Trevor and I wired the gauges.
Jon is color sanding the car. As soon as he's done I'll post pics. Clayton Machine pedals are installed as well as the Wilwood master cylinder. More updates soon.