Got the coilover rear end home.
After carefully measuring I tack welded it in to place. Loosened all the bolts, measured again, and then finished the welding. I also installed side mounting plates to give additional strength.
Installed the Currie 3.25:1 differential, torque arm, and side subframe braces.