Man it's been a long week! My brother and I took a full week of vacation and put in 5 12-14 hr days working on the old car. I was hoping to have made more progress however we have never done anything like this before. He is a mechanic by trade and knows cars in and out but blending 4 or 5 electrical systems took some homework and planning.
Last week I sprayed the trunk pan and underside of the fenders in upol raptor and had the local glass guys install the rear window.
For the heat and a/c we used Eaton ez clip hoses and fittings and a II Much fab airport bulkhead to get through the firewall.
At the start of the week there wasnt a single wire in the car. Now the dash wiring is pretty much done other than a few loose ends. The Dakota digital gauges and interface is complete. The dual fans and controller just needs a power wire ran to be complete, the vintage air is all set and the dse wiper is setup as well.
Since the clutch plate forces you to relocate the electrical bulkhead from under the hood to under the fender I upgraded to a sealed weather pack.
I'll post the random pictures I shot from the week.
[IMG]https://uploads.tapatalk-
cdn.com/20180730/6bcfb9094a6c81e59e7a1458b33d0be3.jpg[/IMG]
Sent from my SM-G892U using Tapatalk