...

Go Back   Lateral-g Forums > Technical Discussions > Man Caves
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 09-19-2010, 06:21 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,424
Thanks: 908
Thanked 336 Times in 229 Posts
Default Attached two stall Garage build

This will be my build thread We might start slow but we will start.
My contractor came by the house Saturday to mark out for excavation. We decided because of my variance we had better get the actual property line to be safe. I only have 2" to be off any closer to the property line and I will need another variance. Which I don't need to deal with.
I got in touch with the surveyor and he informed me this is not in the deal we had so I have to pay for him to put monumentation for the property line and for the as built after construction. It feels like I should be getting a french kiss when someone does this to me. So I hope he can get here early Monday or this will be another hold up.
This may seem small, but not to me. Anyone who has gone through the variance process knows how big this is.

__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK

Last edited by waynieZ; 09-20-2010 at 09:19 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 10:09 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright Lateral-g.net