Thanks.
Thanks guys its flying now It might be done next week if all goes well..
Today they installed the A/C sleve in the back wall. He also trimmed out the front soffit area. Then he started the vinyl on the side and back.
Here are some pictures of the vinyl going on.
Trimmed out with the AZEK and vinyl corners.
Here is the A/C sleve. I know it looks low but the heat will be above it. and inside the floor is lower than the outside grade. Sorry for the shaky pictures.
They also started the front porch. There's a 4" deep 12x12 footing for the PT 6x6 . The weight from the roof is on the wall not on the 6x6 so all it will hold is the porch itself. They are putting a 8" sonotube for the bottom of the stairs. Here are some pictures.
Here is a picture of the roof with the two sun tunnels on it.