I'm not a sheet metal guy so I was looking to have somebody do the minitub for me. I bought the ABC Performance tubs. When I couldn't get the local shops to even contact me back after several tries I gave up and decided to do it myself.
Most shops claim 30-40 hours labor for this, so just for fun I'm going to keep track of my hours. Never done one before so we'll see how it goes. I cut out the hole for my T56, but the patch panel I had is not big enough, so I ordered a Tinman Fab unit made specifically for this car, but it was also not tall enough, and the hole I cut is pretty much minimal for clearance. So now I have a Bowler universal tunnel that looks like it'll work. I'll be doing that after the minitub.
So this is where I am after 5 hours; got the spot welds drilled out and the old tub removed.