Quote:
Originally Posted by Streetking
Anyone know how long it takes to install the DSE mini tubs, subframe connectors & quadralink in a 2nd Gen?
|
Hi SW
Dan over at Holohan Hot Rods gave me this info about a year ago.
1185-C Gateway Drive
Mooresville, NC 28115
(704) 450-0607
http://holohanshotrods.com/
Not sure if there many shops better them him.
Mini-Tubs 40-45 Hours
Subframe Connectors - 20 Hours
Quadra-Link - 40-45 Hours