I ran all of the electrical and laid the outlets the way I wanted them. I put power everywhere and 240V outlets in every corner. Rick Davis wired it and set me up perfectly for me. He'll be an LG member very soon. Aimee and I insulated the walls and laid up the 4x12 sheets of rock. She and I taped and textured the shop. This took us almost a week alone at night until late.
After paint, the outlets went in and the box was terminated.