|

08-26-2015, 07:15 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
The plate is plug welded in place with a few stitches around the perimeter.
|

08-26-2015, 07:19 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
The 3 bolt holes are drilled thru from the inside. The top bolt is above the upper tangent so it won't be flush. The upper hole was opened up to about 3/8" thru the cowl (just large enough the clear a 1/4-20 socket head cap screw)
Last edited by Ambition Road; 08-26-2015 at 07:39 PM.
|

08-26-2015, 07:21 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Motor is installed
|

08-26-2015, 07:25 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Inside view
|

08-26-2015, 07:27 PM
|
 |
Lateral-g Supporting Vendor
|
|
Join Date: Nov 2004
Location: washington, ok
Posts: 4,215
Thanks: 21
Thanked 107 Times in 62 Posts
|
|
Thats awesome you figured it out, but sucks that DSE is currently not producing wiper motors at this time.
|

08-26-2015, 07:28 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
The top bolt will need to be sealed during final assembly with a small amount of 3M strip caulk.
|

08-26-2015, 07:30 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Taking measurements before cutting, the stock arm will be welded to the DSE arm with the splined hole.
|

08-26-2015, 07:32 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Tacked together, rechecking measurements.
|

08-26-2015, 07:33 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Welded and metal finished.
|

08-26-2015, 07:36 PM
|
Lateral-g Supporting Vendor
|
|
Join Date: Apr 2015
Location: Mooresville, NC
Posts: 96
Thanks: 16
Thanked 25 Times in 6 Posts
|
|
Update complete. Upon final assembly the "park" position will need to be set and nut torqued.
|
Thread Tools |
|
Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -5. The time now is 12:04 AM.
|