View Single Post
  #479  
Old 06-20-2021, 10:30 PM
CamaroAJ's Avatar
CamaroAJ CamaroAJ is offline
Lateral-g Supporting Member
 
Join Date: Mar 2010
Location: San Antonio, Tx
Posts: 877
Thanks: 104
Thanked 281 Times in 133 Posts
Default

Ok lets get up to speed on the last few weeks. I finished up the driver side brake and trans cooler duct.







The engine came back from the machine shop and I'm ready to assemble it once I get a few more bolts and bearings ordered. I still don't know what cam I want to go with either. I started working on the supercharger cover by grinding down the Corvette letters and back filing them with panel bond. On the center console I stared to fiberglass the gap until I ran out of glass. The cover and console are coming along nicely tho.






Most importantly I finally got some epoxy shot on the inner structure and have started the final fitment and welding of the quarters. It took a lot longer then I figured it would to get everything fit and mostly welded up. I still have more welding to do across the top and back before I can grind the welds and start the hammer and dolly process. Big step forward to having a whole car again tho.


__________________
Instagram- camaroaj
Reply With Quote
The Following 5 Users Say Thank You to CamaroAJ For This Useful Post:
camcojb (06-20-2021), Che70velle (06-21-2021), dhutton (06-21-2021), EVIL SS (06-23-2021), Roscoe03 (06-21-2021)