...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 09-08-2005, 08:50 PM
62fairlane 62fairlane is offline
Member
 
Join Date: Jul 2005
Location: so. ILL
Posts: 80
Thanks: 0
Thanked 0 Times in 0 Posts
Default progress on the '62

well I pretty much have the turbo mounted (need bolts and gaskets for it) which feels like I got alot done as all I need now is to plumb the turbo to bonnet. to do that I need to mod my bonnet and get a flange made for my BOV to mount to. after that then I am on to plumbing the oil and fuel system. most of which is laid out and I just need ot bend tube for.




I turned down my wheel spacers today (took out .25") to try and get the wheels farther under the fenders as I am having some conflict issues (looking for solutions) by the end of the weekend I shoudl have the caliper mounts figured out and will order the stock to make those. once the mounts are made I just need to toss lines on them and they are done.

Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 10:05 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net