...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 02-04-2012, 04:56 PM
AtomicFirebird's Avatar
AtomicFirebird AtomicFirebird is offline
Member
 
Join Date: Apr 2011
Location: Palm Beach County
Posts: 65
Thanks: 2
Thanked 15 Times in 8 Posts
Default Formerly known as Green Machine

I have been around the site showing very slow updates on the Welcome side. I Thought I would move to the project Update side. I changed the name because I am not going to paint it green anymore.

I already have Speedtech upper and lower control arms.
Right stuff detailing brakes and lines.
Covan Dash with comp gauges
Pypes exhaust.
Boss 338 Wheels and tires.
Autowire electrical which I already put together.
New inner and outer tie rods with Speedtech tie rod connectors.
Rebuilt 400 motor with D-port ram air exhaust.
I have my Tremec 5 speed
10 bolt with a 3.42 rear
Front and rear disc brakes
New gas tank and sender with new fuel lines.
Now if I can only get the metal work done. I could put the car back together
Attached Images
  
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:39 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net