...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 09-29-2014, 12:32 PM
frankv11's Avatar
frankv11 frankv11 is offline
Senior Member
 
Join Date: Dec 2009
Location: socal
Posts: 963
Thanks: 0
Thanked 28 Times in 17 Posts
Default

Slowed down a bit , new member in the family
But still getting some work done
Brake lines are done was able to run one piece from proportioning valve to flex line for fronts. 3/16 SS. Any one looking to buy a flaring tool I will highly recommend the RIGID 458r for 45s and they also have a 37 degrees. That's the best tool I have bought and here benders same quality.
Fuel plumbing is also checked off the list 3/8 SS.
I ran both fuel and brake-lines on the inner side if rail "hope it don't get to hot"" maybe build a heat shield.

Rear end passenger side piece

Front passenger


Followed the DSE weld

[URL=http://s1232.photobucket.com/user/frankv11/media/Mobile%20Uploads/photo4_zps93ae9fe2.jpg.html]


Need just a bit if massaging here once I can get access to sett up clamps



Founds these at LBC swapmeet $50 ohh yeah

Cut rings to make them fit like I want them " tight"


Cut and flared out the buckets

Setting up clutch pedal with a stop and pushed pedal 1/4" towards passenger

Last edited by frankv11; 09-29-2014 at 01:10 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 08:39 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net