...

Go Back   Lateral-g Forums > Technical Discussions > Shop & Equipment
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 05-26-2010, 05:36 PM
scherp69's Avatar
scherp69 scherp69 is offline
Lateral-g Supporting Member
 
Join Date: Dec 2007
Location: British Columbia, Canada
Posts: 882
Thanks: 0
Thanked 4 Times in 2 Posts
Default Can I remove this post in my shop???

This past winter my wife bought a 2009 Dodge Charger. Now that she has that car and drives it year round, she's planning on selling her 97 Camaro RS. When the Camaro is gone, this will mean I get the entire shop to myself. One thing that I have always found really annoying in the shop is a post in the middle of the shop. I know it is a load bearing post, but is there anything I can do (that won't cost me a fortune) to get rid of the post. Why do I want to get rid of it....I think that's obvious

Here's a pic of the shop and the post I'm talking about. The beam above the post runs the length of the shop. That beam is two 2x10's screwed together to make one beam.



Here's a couple pics of the attic. I was wondering if I would be able to add more 2x4's to support the roof enough to remove the post.





Anyone have any thoughts?? Thanks in advance.
__________________
Mike

Pro Touring 68 Acadian(Nova)
Speedtech subframe with high clearance control arms
Prodigy Bar rear suspension
Ridetech single adjustable coilovers
Wilwood 12.2" brakes
New Gen Splitters
LS3 and TKO600

Link to my build: https://lateral-g.net/forums/showthread.php4?t=14349


Last edited by scherp69; 05-26-2010 at 05:48 PM.
Reply With Quote
  #2  
Old 05-26-2010, 06:44 PM
Vegas69's Avatar
Vegas69 Vegas69 is offline
Senior Member
 
Join Date: Dec 2006
Posts: 8,692
Thanks: 87
Thanked 215 Times in 120 Posts
Default

Looks kind of important.
__________________
Todd
Reply With Quote
  #3  
Old 05-26-2010, 07:52 PM
War's Avatar
War War is offline
Senior Member
 
Join Date: Oct 2008
Location: Oakdale,CA
Posts: 383
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Whats the span and is that beam directly under the ridge? Adding more 2x4's wont do anythig. That beam is more than likely just holding up the cieling joist by looking at the pics. You could or should of had some collar ties on those rafters. You can put a larger beam in to handle the span and load, but lots of work.It would be better to have the bottom of the beam flush with the cieling and burry the rest in the attic if that makes sense. Of course I dont know if the existing footings are large enough or what your roofing or snow loads are in that area. You would need an engineer, maybe from a truss plant, to calc that for you,... or hang a naked girl calander on the post and call it a day.
Also, I think it's time to cash in the cans.
__________________
Jason
Reply With Quote
  #4  
Old 05-26-2010, 08:01 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

Bring the beer cans to Washington they're worth a nickel a piece - then hire a proper contractor.
Reply With Quote
  #5  
Old 05-26-2010, 08:15 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

Seriously - that span would have to have one heck of a beam without the post... You're carrying the roof load - and you have to calculate for a snow load etc.

I put up a "mezzanine" in the shed -- it has a single beam to carry the floor - no roof load - and it runs 16 feet - and it's 8" wide by 19 1/2" thick!
Reply With Quote
  #6  
Old 05-26-2010, 08:28 PM
HRBS's Avatar
HRBS HRBS is offline
Senior Member
 
Join Date: Oct 2006
Location: New Jersey
Posts: 1,190
Thanks: 0
Thanked 1 Time in 1 Post
Default

That beam isn't holding any roof load at all. Its holding the celing joists like WAR noted. First off a double 2x10 beam isnt much at all so the load isnt that great regardless of span. What is the total span of the double 2x10 beam ? The live load in clg joists arent as much as a live load in a floor joist. The clg joist dead load may not even be a factor either due to the small overall span. A beam only takes half the span. the other half is supported on the exterior walls. You can definetly get away with creating a "flitch plate" beam and eliminate the column all together. A flitch plate is the combination of conventional wooden lumber and steel plate sandwiched and thru bolted together. The splice joists overlap creating a solid beam mass. PM me ALL the dimensions of the garage including the overall span of the beam and clg joists above and the directions of each. I'll run a calculation and provide you with what size steel plate and how many additional 2x10 joists you'll need.
I have an architectural degree and its my day job if it helps reassure you... LOL.
__________________
HRBS on Facebook

Last edited by HRBS; 05-26-2010 at 08:32 PM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 10:34 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net