Quote:
	
	
		| 
					Originally Posted by 70 chevelle  How long till the electrical system is live? I would love to know your opinion on the system once it's running. I have been looking at it for a while but I'm a little eeeery about facing the gremlins, if any. very interesting system. | 
	
 It should be powered up tomorrow or Saturday at the latest.  The real world caught up with me a bit this week and I wasn't able to put in the time that I wanted on the wiring but change tomorrow.
One of the many things that I like about the ISIS System is that, if anything, the gremlins will be easier to deal with given the systems smart diagnositic capabilities.  One of the other things that I like is that the switching side into the Mastercell is via grounds and not hot wires.  Saves some wear and tear on switches and eliminates a bunch of hot wires under the dash.
I'll keep you posted when we start running power to some of the loads.