...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 07-06-2012, 07:34 AM
Vetterodder com Vetterodder com is offline
Member
 
Join Date: Jun 2012
Location: Boynton Beach, FL
Posts: 50
Thanks: 0
Thanked 0 Times in 0 Posts
Default

My C5/C6 STREET SHOP INC frame for the 1964 Corvette Roadster is laid out to show the individual pieces that will make up the frame. The pieces will of course be placed on a jig and welded. See later pictures below.





Parts are cut, cleaned and prepped for welding. All parts are prepped for 100% welding.



Front cross member is finished, ready to install into jig and clamped down.






Frame rails are placed on jig to be cut to length, after cutting to length, end caps are welded to close up the rail.




The following pictures highlight the STREET SHOP chassis weld preparation to perform 100% welding. You can also see the welds up close and personal. After the main rails are welded, it is unclamped and allowed to cool so it will return to its relaxed state.





Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:19 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net